LNG project in Raubach, Germany

Raubach, Germany

End:

february 2023

Status:

In progress

Tanks 80 m3. Evaporators 1520Nm3/h.
Expected consumption ca 20MWh, flow ca 1773 m3/h.

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.