LNG project in Joutseno, Finland

Joutseno, Finland

End:

november 2022

Status:

In progress

Technical data:

Tanks 80 m3. Evaporators 2000Nm3/h.
Expected consumption ca 20MWh, flow ca 1773 m3/h.

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.