LNG projekt Saksamaa, Raubach

Saksamaa, Raubach

Lõpp:

veebruar 2023

Staatus:

Valmis

Mahutid 80 m3. Aurustid 1520Nm3/h.
Oodatav tarbimine ca 20MWh, vooluhulk ca 1773 m3/h.

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.